Fig. 1From: Drying response of lime-mortar joints in granite masonry after an intense rainfall and after repointingExperimental set up during spraying and evaporation and drying, and location of the measurements. The protective board in plywood were preventing water from touching the other face of the wall and gutters were collecting the run-off water. The blue circle represents the area sprayedBack to article page