Fig. 11From: Drying response of lime-mortar joints in granite masonry after an intense rainfall and after repointingDifferences of moisture level (MI) of the mortar joints over time before and after being repointing. Error bars indicate the first and last quartile. The x-axis represents different time intervalsBack to article page