Fig. 1From: A comprehensive evaluation of the development degree and internal impact factors of desiccation cracking in the Sanxingdui archaeological siteThe Sanxingdui site and desiccation cracking on site (a location of Sanxingdui site. b No. 2 sacrifice pit excavated in 1986. c protective shelter construction. d microenvironment control system. e the workspace in the protective shelter. f desiccation cracking development)Back to article page